Landing Stations
Every facility here states its real location, colocation capacity, and power — carrier-neutral colocation adjacent to the cable head itself.

Solano Link's European landing point on Portugal's Atlantic coast — 700 racks and 10 MW, plus an on-campus…

Current's flagship Asia-Pacific hub — 1,200 racks and 18 MW, the shared landing point for Amberline and the…

Tradewind Express's Japan landing point in Chiba Prefecture — 500 racks and 8 MW, with onward backhaul into…

Meridian-1's US landing point on the New Jersey shore — 600 racks and 9 MW, with direct terrestrial…

Meridian-1's UK landing point on the Cornish coast — 800-rack colocation campus with 12 MW of critical power.